Nashuk LP led a road realignment project for the Ministry of Forestry, improving a key 25km logging road near Port Alberni. Over 1,400 metres of grade reduction improved slope, stability, and drivability, while road realignment enhanced geometry and sightlines. Two large culverts, three cross drains, blasting, and added road fill strengthened the base and improved drainage.